Set up your project: look, test link and safety – Step-by-Step Guide | Vibe96
Vibe Studio

Set up your project: look, test link and safety

Published Last updated 2 min readBy Vibe96 team

Short answerProject settings hold your description, look and feel, brand colours, design review, app login, environment variables, protected files and test link behaviour. You can also archive or delete a project there.

A few minutes in Settings saves many messages to Nova later.

General

  • Description: Nova uses it when planning your app. Keep it true as your idea changes.
  • Build retries: how many times Nova may retry a failed build before stopping.

Look & feel

  • Style and kind of app: the style Nova designs every page in, and the layout recipe it follows.
  • Brand colours: colours you set here win over the logo and the style.
  • Tick the box to add a "restyle the app" task to your checklist when you change the style.

๐Ÿ’ก Change the look early. Restyling a finished app is a build like any other.

App login

Your app's admin account is created the first time the app starts. Its details are shown here. Change the password in your app after you sign in.

Your test link

Under Preview:

  • Sleep after idle minutes: a sleeping test link wakes in a few seconds on the next visit.
  • Keep awake: for apps with AI assistant access or scheduled jobs, within your account's limit.
  • Restart the app: applies right away.

Test links are always hidden from search engines.

Safety settings

  • Environment variables: keys and settings your app reads. They are encrypted and never sent to Nova.
  • Protected files: files and folders Nova never reads or changes.
  • Standards: switch a standard back on for this project only.

Teach Nova your way of working

Open Skills & standards in your account. Teach Nova and the team how you want things done, for example your naming rules or the tone of your texts. It applies to all your projects and is saved in your account only.

Showcase

Vibe Studio may ask to show your project to other users as an example, view only. You choose which messages they see, and you can stop it at any time.

Danger zone

  • Archive project: the test link stops. The code and database are kept, and you can restore the project any time.
  • Delete project: removes everything for good: the test link, the app and its database, every version, the chat, files and settings. It cannot be undone.

Download the code first if you want to keep it. See Download your code and files.

A sensible first set-up

  1. Check the description.
  2. Set your brand colours.
  3. Note the app login and change the password.
  4. Add the environment variables your services need.
  5. Leave the rest on its defaults.

๐Ÿ’ก Archive instead of delete when you are unsure. An archived project costs you nothing to keep and comes back with one click.

Questions

What is the difference between archive and delete?

Archive stops the test link and keeps everything. Delete removes everything for good and cannot be undone.

Why did my test link take a few seconds to open?

It was asleep. Unused test links sleep and wake on the next visit.

Do my brand colours override the logo's colours?

Yes. Colours you set in Look & feel win over the logo and the style.

Was this guide helpful?